For electrical contractors

The certificate is what gets you paid. Treat it that way.

Electrical work is finished twice: once with the tools, once with the paperwork. Worksted holds the invoice until the second one is done — so nothing goes out incomplete, and nothing sits in a drawer for three weeks either.

Worked example

The business
A 20-person electrical contractor
The job
Main switchboard upgrade and sub-mains, two-week shutdown
The site
Secondary college, science and admin wings

A school switchboard upgrade, staged through the term break, that cannot be invoiced until its test results are on the job.

One record, all the way through. The docket keeps up on its own — scroll, and watch it fill in. Marked in the term break, day by day.

Day 1Office

Priced off your own book, in your own words

The estimate goes together from your price book — boards, RCBOs, cable by the metre, day rates. Every line copies its price the moment it is added, so the quote you send is the quote it stays.

New quote

Drafting
  • Switchboard, 24-pole 3-phase

    1 ea

    $1,865.00

  • 16mm² sub-main, XLPE to Cu

    38 m

    $1,424.00

+ Add from price book
Total inc. GST$3,617.90
Day 2Office

Staged across the shutdown you actually have

The board is the two weeks you were given. Book the isolation day, the board change, the testing — each one its own visit on the same stage, each with the crew who will be there.

This week

4 on site

Dev

Isolation & make safe

Mon

Marko

Board change

Tue–Thu

Ash

Sub-mains to admin

Wed–Fri

Tui

Test & results

Fri

Day 6Field

The sub-main is undersized. That is a variation, not a favour.

Priced on the spot off the same book, sent by the office, and accepted by the business manager on a link with no login. It is on the job from that moment — and it is on the invoice at the end.

Day 9Field

Results filled in on the phone, meter photo attached

Insulation resistance, RCD trip times, polarity — your form, your fields, filled in standing at the board. The photo of the meter is a field on the same form, so the reading and the proof of the reading arrive together.

Main switchroom

Submitted
RCD trip times18 ms
Insulation resistance>200 MΩ
Meter photos6
Day 11Office

No certificate, no invoice — and the button says so

You set the certificate to hold invoicing, so until it is on the job there is nothing to click. Not a warning somebody dismisses: the control is not there, and the reason is in its place.

Switchboard upgrade — stage 3

Blocked
Client
Waiting on: Certificate of Electrical Safety
Site
Everything else is done
Day 12Office

Out the door with the compliance pack behind it

Tax Invoice, your ABN, GST on its own line, BSB and account — frozen onto the invoice the moment it is issued, so a later edit to the job can never rewrite a bill the client is already holding.

Tax Invoice

INV-1184

Your electrical business · ABN 51 824 753 166

Subtotal$18,450.00
GST (10%)$1,845.00
Total due$20,295.00

BSB

063-502

Account

1084 7291

The job, start to finish

JOB-2207

Secondary college · main switchroom

Invoiced

Quoted

Fixed price, off the price book

$18,450.00

Visits booked

One stage, two weeks

7

Variation accepted

Sub-main upsized, signed on site

$2,140.00

Labour

146 h logged at the board

$8,920.00

Materials

Supplier dockets read on site

$6,115.00

Invoiced inc. GST

$22,649.00

Margin

27.0%

$5,555.00

Quote — switchboard upgrade

Boards, protection, cable by the metre and a day rate that reflects what a shutdown actually costs you. Build it on site off your price book, or in the office off the same one.

Your price book, your wording, your rates. Lines copy onto a quote the moment they’re added, so putting your prices up next month never rewrites what you sent last month.

A client on agreed rates gets those rates, baked into the line rather than remembered by whoever built the quote.

JOB-2207

Secondary college · main switchroom

Ex GST unless shown

  • Switchboard, 24-pole 3-phase

    1 ea

    $1,865.00

  • 16mm² sub-main, XLPE to Cu

    38 m

    $1,424.00

  • RCBO, 20A Type C

    18 ea

    $972.00

  • Emergency light, recessed LED

    11 ea

    $764.50

  • A-grade electrician, day rate

    9 days

    $14,189.00

Subtotal$19,214.50
GST (10%)$1,921.45
Total inc. GST$21,135.95

What has to be on file before this job closes.

You decide what each of these is, who owes it, when it is due and what it holds up. After that they raise themselves, and the job says out loud what it is waiting on and who it is waiting on.

Certificate of Electrical Safety
Set it to hold invoicing and the bill cannot leave without it — on the convert path and on a manual status change alike, so there is no side door.
Test results sheet
Build the form once with the fields you actually record. It is filled in on the phone at the board, and the meter photo is a field on the same form rather than a separate errand.
A-grade licence and ticket
Sits on the person, not the job. When someone whose ticket has lapsed is put on the crew, they are left off and named — you find out at the whiteboard, not on site.
Site induction for this client
Put it on the client or the site once. Every future job captured for them carries it automatically, including the ones raised on a phone at 7am.

You write these rules yourself, once — what evidence, who it’s for, when it’s due and what it holds up. From then on they raise themselves.

Three ways this work loses money.

Not software problems — electrical contractors problems. Here is what Worksted does about each of them.

The invoice that sat for three weeks

Work finished, certificate never uploaded, nobody noticed until the client rang about something else. Hold invoicing on the evidence and it stops being possible to forget — the job carries its own outstanding list.

The extra work nobody wrote down

A sub-main upsized on the nod because it was easier than a phone call. Raise it as a variation on site, price it off the same book, and the client accepting it is a recorded decision rather than a memory.

The rate you put up in March

Quotes issued before a price rise stay exactly as they were sent. Lines copy your book the moment they are added, so a price change tomorrow never quietly rewrites what a client already signed.

Put a certificate on a live job and try to invoice it.

Fourteen days. Set one requirement to hold invoicing and watch what happens when the paperwork is not there.